Systems Monitored12All connected
Active Alerts3Needs attention
Fleet PR91.4%Performance ratio
Daily Check06:00 today
Monthly CheckApr 1, 2026
System Health Overview Live
SYS-001
Block A Rooftop · 110 kWp
Healthy
98.4%
Performance Ratio
Output
42.5 kW
Yield
4.12 kWh/kWp
Uptime
30/30 days
Inv. Temp
42°C ✓
SYS-002
Block B Rooftop · 100 kWp
Healthy
96.1%
Performance Ratio
Output
38.8 kW
Yield
3.95 kWh/kWp
Uptime
30/30 days
Inv. Temp
44°C ✓
SYS-007
Marina East · 80 kWp
Warning
85.2%
Performance Ratio
Output
26.1 kW
Yield
3.28 kWh/kWp
Issue
Shading
Since
Apr 3
SYS-004 ⚠
Block C Rooftop · 50 kWp
Critical
58.6%
Performance Ratio
Output
11.2 kW
Yield
2.24 kWh/kWp
Issue
Inv. Fault
Since
Apr 8
Underperformance Alerts 3 Active
SystemLocationIssueGapDaysAction
SYS-004Block C RoofInverter MPPT fault — 40% output loss-41.4%8
SYS-007Marina EastNew building shading — afternoon loss-14.8%5
SYS-011School BldgGradual output decline — suspected soiling-11.8%12
Fleet Performance Ratio — 7 Day Trend

Performance Ratio = Actual Output ÷ Expected Output (based on irradiance × capacity). Measures how well each system converts available sunlight.

Daily Check — Apr 8, 06:00 Complete
Communication Check
All 12 systems reporting data. No communication gaps detected.
12/12 systems online
!
Performance Ratio Scan
Compared actual output vs irradiance model for each system.
3 systems below threshold (>10% deviation)
Inverter Health
Checked DC voltage, MPPT tracking, temperatures, error codes.
1 inverter fault flagged (SYS-004 Inv.2)
Energy Meter Validation
Cross-checked inverter totals vs grid meter readings.
All within 1.5% tolerance
Monthly Check — Apr 1, 2026 Complete
Degradation Analysis
Year-on-year output comparison adjusted for irradiance.
0.4% annual degradation — within expected range
Visual Inspection Flag
Output degradation trend detected on SYS-011 consistent with panel soiling (gradual decline over 12 days).
SYS-011 flagged — on-site visual inspection recommended
Warranty Compliance
Checked all systems against manufacturer warranty conditions.
All systems compliant — no warranty risks
Alert History
SYS-004 inverter fault alert → Ahmed K.10 min ago
SYS-007 shading alert → Farid M.2 hrs ago
SYS-002 recovered — PR back to 96%Yesterday
SYS-009 cleaning completed — PR +3.1%Apr 5
SYS-011 output decline flagged — inspect panelsApr 3
Monthly check completed — all 12 systemsApr 1
Assigned Technicians
AK
Ahmed Khalil
Lead Technician · SYS-001 to SYS-006
FM
Farid Mohamed
Field Technician · SYS-007 to SYS-012
📋 Active Assignments:
• Ahmed K. → SYS-004 inverter investigation (dispatched today)
• Farid M. → SYS-007 site visit for shading assessment (scheduled Apr 10)
• Farid M. → SYS-011 panel inspection & cleaning (scheduled Apr 12)
Recommendations
🔧
Urgent: Investigate Inverter Fault (SYS-004)
MPPT tracking deviation detected since Apr 8 — output 40% below expected on String B. Dispatch technician for on-site diagnosis. Possible causes: contactor failure, MPPT board fault, or DC wiring issue.
💰 Lost output: ~$67/day📈 Fleet PR: 91.4% → 95%+ after fix
🌳
Address Shading on SYS-007 (Marina East)
New construction adjacent to site is shading rows 3-4 during afternoon hours. Options: trim vegetation (if applicable), adjust tilt angle, or relocate affected panels.
📈 +14.8% performance recovery⏰ Site visit scheduled Apr 10
🧹
Establish Panel Cleaning Schedule
SYS-011 showing gradual output decline consistent with soiling. Recommend bi-weekly visual inspection and cleaning during dry season across fleet to prevent performance drift.
📈 Prevents 2-4% gradual PR loss💰 Low-cost preventive measure