Current Output85 kWLive
Today's Generation425 kWh▲ 5% vs yesterday
Performance Ratio94.2%vs irradiance model
MTD Energy42.8 MWh▲ 8% vs Mar
Today's Savings$118diesel avoided
Actual vs Expected Generation — April 2026 Peak: 98 kW at 12:45 PM
Click to expand

Expected = irradiance model output for installed capacity. Performance ratio shown on right axis. Dips in Week 2 caused by overcast weather + inverter 2 degradation.

Fleet System Performance
SYS-001 · Block A
110 kWp · Online 30/30 days
98.4%
SYS-002 · Block B
100 kWp · Online 30/30 days
96.1%
SYS-003 · Block C
80 kWp · Online 28/30 days
95.7%
SYS-004 · Block D ⚠
50 kWp · Inverter 2 fault from Day 8
72.3%
⚠ Why 72.3%? Inverter 2 on SYS-004 developed MPPT tracking fault on Apr 8. Output dropped 40% on that string. Combined with 3 overcast days (Apr 8-10), Week 2 saw 5.8% below-expected generation fleet-wide.
Inverter Status Live
Inverter 1Online
42.5 kW
DC Voltage
645 V
Efficiency
97.2%
Temperature
42°C
Frequency
50.01 Hz
Inverter 2 ⚠Degraded
18.2 kW
DC Voltage
580 V ⚠
Efficiency
91.4% ⚠
Temperature
56°C ⚠
MPPT
Fault
Inverter 3Online
38.8 kW
DC Voltage
638 V
Efficiency
96.8%
Temperature
44°C
Frequency
50.00 Hz
Inverter 4Online
35.1 kW
DC Voltage
652 V
Efficiency
97.5%
Temperature
40°C
Frequency
50.01 Hz
🌱 Carbon & Environmental Impact
28.4 T
CO₂ Avoided (MTD)
312 T
CO₂ Avoided (YTD)
24,800 L
Diesel Displaced (YTD)
Equivalent to 14 round-trip flights London→New York or taking 68 cars off the road for a month.
💰 Financial Summary
MTD Savings
$3,540
YTD Savings
$42,600
Solar LCOE
$0.08/kWh
Diesel Cost
$0.29/kWh
Solar generation is 3.6× cheaper than diesel per kWh on this grid.
Recommendations
🔧
Investigate Inverter 2 Fault (SYS-004)
MPPT tracking deviation detected since Apr 8 — 40% output loss on String B. Dispatch technician for on-site diagnosis to identify root cause (contactor, MPPT board, or DC wiring). Estimated lost revenue: ~$67/day.
💰 Recovering ~$67/day📈 Fleet PR from 94.2% → 97%+
🧹
Schedule Panel Cleaning — All Systems
Gradual output decline trend detected across fleet, consistent with panel soiling. On-site visual inspection and cleaning recommended bi-weekly during dry season.
📈 +2.5% Performance Recovery💰 ~$90/month

Actual vs Expected Generation — April 2026